The NEVI Program

What is the NEVI program?

The National Electric Vehicle Infrastructure (NEVI) program is a landmark initiative by the United States federal government which during the five-year period will invest a total $5 billion in the roll-out of public EV charging infrastructure across the nation. The aim of the program is to lay the foundation for an EV charging network consisting of 500,000 EV chargers by 2030 along the nation’s interstates, highways and in communities.

The program was established through the Infrastructure Investment and Jobs Act (IIJA) in 2021 and will provide funding to the States to deploy EV charging infrastructure with an initial focus on the designated Alternative Fuel Corridors (AFC).

NEVI FAQ

ADS-TEC Energy’s solution for the NEVI program

ChargeBox

NEVI-compliant solution

The ChargeBox fulfills the federal requirements and standards set out for NEVI-funded charging locations. The system is UL certified and in compliance with the interoperability and network connectivity provisions defined by the FHWA.

NEVI-compliant solution

The ChargeBox fulfills the federal requirements and standards set out for NEVI-funded charging locations. The system is UL certified and in compliance with the interoperability and network connectivity provisions defined by the FHWA.

Four CCS charging ports

Our NEVI solution consists of four small-footprint CCS charging dispenser (160 kW / 320 kW) with a surface area of only 16”x16” per dispensers. Together they easily meet the minimum power level requirement per site (≥600 kW) as well as per charging port (≥150 kW).

Four CCS charging ports

Our NEVI solution consists of four small-footprint CCS charging dispenser (160 kW / 320 kW) with a surface area of only 16”x16” per dispensers. Together they easily meet the minimum power level requirement per site (≥600 kW) as well as per charging port (≥150 kW).

Battery-buffered system

Each ChargeBox system is equipped with an integrated 140 kWh nominal battery storage unit. The battery booster enables high-power charging, even on power-limited grids.

Battery-buffered system

Each ChargeBox system is equipped with an integrated 140 kWh nominal battery storage unit. The battery booster enables high-power charging, even on power-limited grids.

Accelerated time-to-market

The use of a battery-buffered system avoids costly and time-intensive expansions of the electricity grid by only requiring a reduced grid connection power. Additionally, the extremely compact design as a complete system provides for an easy and fast on-site installation.

Accelerated time-to-market

The use of a battery-buffered system avoids costly and time-intensive expansions of the electricity grid by only requiring a reduced grid connection power. Additionally, the extremely compact design as a complete system provides for an easy and fast on-site installation.

Demand charge savings

DCFC charging sites create short-term sharp levels in demand which in turn can cause high demand charge fees from utilities. Demand charges are an integral part of the cost-of-service principle of electricity markets. By only requiring a third of the grid connection power, the ChargeBox system generates substantial demand charge savings.

Demand charge savings

DCFC charging sites create short-term sharp levels in demand which in turn can cause high demand charge fees from utilities. Demand charges are an integral part of the cost-of-service principle of electricity markets. By only requiring a third of the grid connection power, the ChargeBox system generates substantial demand charge savings.

Buy America-compliant system

ChargeBox is in compliance with the Buy America requirements for electric vehicle chargers published by the Federal Highway Administration. In December 2022, we revealed our facility in Auburn, Alabama where we plan to invest $8 million and will create approximately 180 jobs in the coming years to expand charging infrastructure in the U.S.

Buy America-compliant system

ChargeBox is in compliance with the Buy America requirements for electric vehicle chargers published by the Federal Highway Administration. In December 2022, we revealed our facility in Auburn, Alabama where we plan to invest $8 million and will create approximately 180 jobs in the coming years to expand charging infrastructure in the U.S.

Our facility in Auburn, AL

ADS-TEC Energy established its first dedicated facility in North America in Auburn in December 2022. At the new location, we are bringing together sales, warehousing, service and assembly and expect to be fully functional by 2024. We plan to invest $8 million and create approx. 180 jobs in the coming years associated with the new site.

How can we help you with NEVI?